Scotch type Steam Generator

MODEL HEAT CAPACITY
BsY Steam kg/h Mkcal/h Kw
150 150 90 105
250 250 150 174
500 500 300 349
750 750 450 523
1000 1000 600 698
1250 1250 750 872
1500 1500 900 1046
2000 2000 1200 1395
2500 2500 1500 1744
3500 3500 2100 2442
4000 4000 2400 2790
5000 5000 3000 3489
Dimensions
Width A Length B Height C Chimney 0
610 1200 610 250
800 1400 800 250
900 1600 900 250
1100 1850 1100 300
1250 2350 1250 300
1300 2400 1300 350
1400 2550 1400 400
1500 2900 1500 450
1325 1350 1325 500
1850 3550 1850 550
1950 3750 1950 550
2150 4250 2150 600

Scotch type Steam Generator

SCOTCH STEAM GENERATOR

1.00-DEFINITION OF STEAM GENERATOR :

– Steam Generator is designed to burn gas and liquid fuel. Operating pressure is 8 bar test pressure 12 bar.

Steam generator type BsY and models are listed as follows.

BsY 150, BsY 250, BsY 500, BsY 750, BsY 1000, BsY 1250, BsY 1500, BsY 2000 BsY 2500, BsY 3500

  • COIL PIPE:

– Horizontally positioned special coil pipe is made of St 35-8 quality 3,6 / 5 mm thick steel drawn pipes in accordance with TS EN 10216-2.

1.02- COIL BEND:

– In accordance with TS EN 13445-4 norms, it is bent with special molds so that the diameter does not exceed 10% and there is no need for heat treatment.

1.03- COMBUSTION CELL:

– Radiation type is designed according to burner flame length and flame diameter.

– Pipe coils are intertwined, twisted in the form of screws, made of pipe inspection. Thus, three passes were made to hot gases.

– Gases continue from the combustion chamber, pass between the 1st pipe coil and the 2nd pipe coil, return through the cover, 2nd pipe coil and the envelope and go to the chimney.

Thus, three passes were made to the gases, their paths were extended and all their energy was taken.

– The cover and counter wall of the combustion chamber are covered with a special refractory material resistant to 1350 ° C. Although the combustion stopped, the temperature of the cell was not lowered, and the soot burning of the generator in the first firings was prevented since the re-jetting fuel quickly reached the ignition temperature in an environment of approximately 900 ° C. Thus, clogging of gas paths with soot was prevented and high combustion efficiency was achieved.

RESULT: Steam is ready to be used within 3 minutes from the moment you press the first button.

2.00- SAFETY AND CONTROL DEVICES IN STEAM GENERATOR:

2.01- 1. PRESSURE STAT:

– In single-stage burners, it controls the 1st stage. When the steam pressure reaches the desired value, it stops the burner.

2.02- 2. PRESSURE STAT (SAFETY):

First pressure stat is adjusted to 0.5 Atu.

If the 1st pressure stat is defective, the pressure continues to load. The second pressure stat opens the circuit and stops the burner. 

2.03- 3. PRESSURE STAT:

– In the double-stage burner, it burns th 2 stages.

2.04- STEAM THERMOSTAT:

Single contact digital thermostat is set at 20 ° C above the saturated steam temperature at operating pressure (195 ° C for 8 bar).

If the 1st pressure stat and 2nd pressure stat fails, because the burning continues, when the steam temperature exceeds the set value, it opens the circuit and stops the burner.

2.04- STEAM THERMOSTAT:

Single contact digital thermostat is set at 20 ° C above the saturated steam temperature at operating pressure (195 ° C for 8 bar).

If the 1st pressure stat and 2nd pressure stat fails, because burning continues when the steam temperature exceeds the set value, it opens the circuit and stops the burner. 

2.05- FLUE GAS THERMOSTAT:

– Single contact digital thermostat is set at 250 ° C.

If the 1st pressure stat, 2nd pressure stat and steam temperature thermostat is defective, burning continues, when the flue gas temperature rises above the set value, it opens the circuit and stops the burner.

2.06- SAFETY VALVE:

– A selected diameter of 10 Atu is adjusted to discharge the steam produced.

– If the 1st pressure stat, 2nd pressure stat, steam thermostat, flue gas thermostat are defective, it opens if the steam pressure rises above the set value and if the steam pressure rises above the set value, it opens and discharges the steam.

3.00- STEAM GENERATOR INSTALLATION:

– Steam generator should be installed in the closest place where the steam it gives off will be used.

– The water flowing from the steam generator drain, feed water pump or armatures should be given to the sewer with the help of a floor filter without dispersing.

– Sufficient gaps should be left around it for easy operation and maintenance.

– It should be such that it is possible to remove the coil in the distance between the top of the boiler and the ceiling. If this distance is not sufficient, a hole must be left in the ceiling sufficient to remove the coil. (Putting on a cover etc.)

– Natural ventilation should be provided with grilles placed at the ceiling or floor level so that the temperature in the place where the steam generator is located does not exceed 30-35 ° C.

– In order not to increase the temperature of the place where the Steam Generator is located, the generator flue outlet, condensate tank, steam and hot water pipes should be isolated.

– In the forced ventilation system, it is not recommended to draw air from the steam generator (aspiration ventilation). The negative pressure created in this way reduces the combustion efficiency of the generator. 

3.01- STEAM GENERATOR AND CHIMNEY DIAMETERS:

– Steam generator capacity and approximate chimney diameters table.

Steam capacity (Kg / h): 150 250 500 750 1000 1250 1500 2000

Capacity (Kcal / h): 90 150 300 450 600 750 900 1200

Chimney diameter (mm.): 250 250 300 300 350 350 400 450

90 ° bends and “T” shaped connections should be avoided as much as possible in the smoke duct. When it is necessary to make it at an angle, it should not be less than 135 °. Horizontal smoke duct length should not exceed 1/3 of the chimney height..

If the smoke duct is long, it should be isolated. The chimney cap should be designed in such a way that it does not prevent the escape of burnt gases.

3.02- ELECTRICAL CONNECTIONS:

– The main fuse group and breaker switch should be placed in the electrical panel where energy is taken.

– 3 phase, 1 neutral 380 volt energy must be connected with a cable with sufficient cross-section until the control and control panel input.

– The generator is connected to the grounding plate with a cable of sufficient cross-section. 

3.03- VOLTAGE AND FREQUENCY:

– Check your voltage and frequency with the voltage and frequency on the boiler label. Measure the voltage and frequency in the circuit, it should not be less or more than 10% of the nominal value.

3.04- ELECTRICITY CONSUMPTION IN STEAM GENERATOR (Kw):

Steam generator

Type 150 250 500 750 1000 1250 1500 2000

Burner 1.1 1.5 1.5 2.2 2.2 2.2 3 4

Circulation pump. 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1, 1 1, 1

Control energy 1 1 1 1 1 1 1 1

Total 3.2 3.6 3.6 4.3 4.3 4.3 5.1 6.1

3.05- CONDENSE TANK:

Type 150 250 500 750 1000 1250 1500 2000

Volume (lt.) 70 100 150 220 330 450 600 700

– The height of the water level of the condensate tank from the pump suction opening:

Condensate temperature (° C): 50 60 70 80 90 100

Height from pump suction nozzle (m.): 1,5 1,5 2 2,5 3 3,5

– Condensate tank water supply should be made with a copper float float.

3.06- WATER SOFTENER:

– It should automatically backwash, regenerate and wash.

– There should be 20-30 mmSS pressure at the raw water inlet, and the raw water inlet should not exceed 35 fr hardness.

– Soft water output should not exceed 0.2 Fr hardness.

– Hot water should not return to the water softener. For this, a check valve must be placed at the condensate tank entrance.

3.07- DOSING PUMP:

-In order to prevent limestone formation, sufficient amount of CEFOPOL should be dosed to the feedwater pump suction. (Approximately 100 kg 150 grams CEFOPOL, depending on the amount of soft water added).

References

No COMPANY NAME ADDRESS MODEL
BSY
CAPACITY
kcal/h
FUEL TYPE
1 ISI TEKNOLOJİ MERKEZİ Gaziantep BsY 1500 900.000 Doğal Gaz
2 ASKAY İNŞAAT Mersin BsY 2000 1.200.000 Fuel-oil
3 TİLAY LTD.ŞTİ. İzmir BsY 1500 1.200.000 Fuel-oil
4 AKDENİZ KİMYA Mersin BsY 2000 1.200.000 Fuel-oil
5 ASKAY İNŞAAT İstanbul BsY 150 90.000 Motorin
6 ORKA Mersin BsY 4000 2.400.000 Motorin
7 ASPAK GIDA İstanbul BsY 250 150.000 Fuel-oil
8 ÇORUM BELEDİYESİ Çorum BsY 500 300.000 M. / LPG
9 SEHİL İNŞAAT Türkmenistan BsY 750 450.000 Doğal gaz
10 SEZEN ET Adana BsY 500 300.000 Fuel-oil
11 EDİRNE  BELEDİYESİ Edirne BsY 250 150.000 Motorin
12 YASİN KAPLAN HALI Gaziantep BsY 2500 1.500.000 Doğal gaz
13 TROBZON BELEDİYESİ Trabzon BsY 750 450.000 LPG
14 DEMİTAŞ A.Ş. Düzce BsY 500 300.000 LPG
15 AFYON BELEDİYESİ Afyon BsY 750 450.000 Motorin
16 EFOR TURİZM Alanya BsY 1000 600.000 LNC
17 ER-DEM MADENCİLİK Tokat BsY 750 450.000 Fuel-oil
18 RIXOS SUNGATE Antalya BsY 500 300.000 LNC
19 THRACE BASİN NATURAL Tekirdağ BsY 750 450.000 Motorin
20 OPTİMA MÜHENDİSLİK Ankara BsY 750 450.000 Fuel-oil
21 ADANA BELEDİYESİ Adana BsY 750 450.000 Fuel-oil
22 HISHTIL – TOROS A.Ş. Antalya BsY 750 450.000 Motorin
23 VENTUS GIDA Moldovya BsY 500 300.000 Doğal gaz
24 PEHLİVAN HELVACISI İstanbul BsY 500 300.000 Doğal gaz
25 GRUP MAKİNA Eskişehir BsY 500 300.000 LPG
26 EDİRNE  BELEDİYESİ Edirne BsY 1000 600.000 M. / D. gaz
27 NİLPOL POLİMER Ankara BsY 750 450.000 Fuel-oil
28 HS GRUP İstanbul BsY 500 3.000 Doğal gaz
29 KIRIKKALE  BELEDİYESİ Kırıkkale BsY 750 450.000 Fuel-oil
30 KIBRIS Kıbrıs BsY 750 450.000 Fuel-oil
31 GÖKCAN TEKSTİL İstanbul BsY 250 150.000 Doğal gaz
32 TROBZON BELEDİYESİ Trabzon BsY 1250 750.000 LNC
33 KARDELEN YIKAMA İstanbul BsY 1250 750.000 Doğal gaz
34 ONİKİ GRUP Rusya BsY 500 300.000 Doğal gaz
35 DELTA GRUP İstanbul BsY 2000 1.200.000 Doğal gaz
36 PINAR ŞEKERLEME Sivas BsY 750 450.000 Doğal gaz
37 AKIN YIKAMA İstanbul BsY 1000 600.000 Doğal gaz
38 DRY WHİTE İstanbul BsY 500 300.000 Doğal gaz
39 AS YAPI İstanbul BsY 500 300.000 Doğal gaz
40 SARMAKSAN Adana BsY 150 90.000 Doğal gaz
41 SINA TEKSTİL İzmir BsY 500 300.000 Doğal gaz
42 TUFANOĞLU DEMİR İstanbul BsY 750 450.000 Doğal gaz
43 MERVE ÖRME İstanbul BsY 500 300.000 Doğal gaz
44 OĞUZ GRUP Türkmenistan BsY 500 300.000 Doğal gaz
45 ARI MÜHENDİSLİK Ankara BsY 250 150.000 Doğal gaz
46 ÜNİVERSAL HAST. GRUBU Diyarbakır BsY500 300.000 Doğal gaz
47 THRACE BASİN NATURAL Diyarbakır BsY 500 300.000 M. / D. gaz
48 ITC ENERJİ Adana BsY 750 450.000 Bio Gaz
49 GIDAMAK Ankara BsY 750 450.000 Doğal gaz
50 MİROĞLU TEMİZLİK Manisa BsY 1000 600.000 Doğal gaz
51 CARBOM KİMYEVİ MADDE İstanbul BsY 250 150.000 Doğal gaz
52 PROBİN GIDA Bingöl BsY 750 450.000 Doğal gaz
53 ADALAR KİMYA İstanbul BsY 2000 1.200.000 Fuel-oil
54 DANIŞ BETON Belarus BsY 1500 900.000 Motorin
55 GÜLÇÜ KARDEŞLER İstanbul BsY 500 300.000 Doğal gaz
56 TAŞKIN TRİKO İstanbul BsY 750 450.000 Doğal gaz
57 DRY WHİTE İstanbul BsY 250 150.000 Doğal gaz
58 DRY İSTANBUL İstanbul BsY 1500 900.000 Doğal gaz
59 KAYHAN ZİRAAT Aydın / Söke BsY 750 450.000 Doğal gaz
60 STERIL-MED Yemen BsY 1000 600.000 Motorin
61 ÇİLTUĞ A.Ş. Gaziantep BsY 750 450.000 Doğal gaz
62 ŞAFAK TEMİZLİK Niğde BsY 250 150.000 Doğal gaz
63 ŞAFAK TEMİZLİK Adıyaman BsY 1250 750.000 Motorin
64 ITC ENERJİ Antalya BsY 1250 750.000 Motorin
65 ŞAVLI GIDA İstanbul BsY 750 450.000 Doğal gaz
66 AZİM GIDA İstanbul BsY 750 450.000 Doğal gaz
67 ÖRNEK MAKİNA İstanbul BsY 750 450.000 Doğal gaz
68 ARS TRİKO İstanbul BsY 750 450.000 Doğal gaz
69 APAK GIDA Nevşehir BsY 1500 900.000 Doğal gaz
70 EFOR TURİZM Alanya BsY 2000 1.200.000 Doğal gaz
71 ADÖKSAN DÖKÜM İstanbul BsY 2000 1.200.000 Doğal gaz
72 FUAR İstanbul BsY 250 150.000 Doğal gaz
73 FUAR Gaziantep BsY 500 300.000 Doğal gaz
74 JANDARMA DİKİMEVİ Ankara BsY 750 450.000 Doğal gaz
75 KIVAM GIDA Bursa BsY 750 450.000 Doğal gaz
76 FRUMAK Kosova BsY 2000 1.200.000 Doğal gaz
77 ANSU GIDA Antalya BsY 1000 600.000 Doğal gaz
78 İNOKSTEK A.Ş. Tekirdağ BsY 500 300.000 Doğal gaz
79 ÖZMAN DERİ TEKSTİL İstanbul BsY 250 150.000 Doğal gaz
80 KOÇAK FARMA İLAÇ Tekirdağ BsY 3500 2.100.000 Doğal gaz
81 KOÇAK FARMA İLAÇ Tekirdağ BsY 3500 2.100.000 Doğal gaz
82 KOÇAK FARMA İLAÇ Tekirdağ BsY 3500 2.100.000 Doğal gaz
83 BAYRAMLAR DOKUMA Tekirdağ BsY 2000 1.200.000 Doğal gaz
84 ÖZMAN DERİ TEKSTİL İstanbul BsY 250 150.000 Doğal gaz
85 NEFİS GIDA Moldovya BsY 1500 900.000 Doğal gaz
86 NESİL GIDA Merzifon /Amasya BsY 750 450.000 Doğal gaz
87 GMT FOOD Bursa BsY 500 300.000 Doğal gaz
88 İNOKSTEK A.Ş. İzmir BsY 1000 600.000 Doğal gaz
89 KOÇAK FARMA İLAÇ Tekirdağ BsY 3500 2.100.000 Doğal gaz
90 KOÇAK FARMA İLAÇ Tekirdağ BsY 3500 2.100.000 Doğal gaz
91 KOÇAK FARMA İLAÇ Tekirdağ BsY 3500 2.100.000 Doğal gaz
92 FRUMAK Rize BsY 2000 1.200.000 Doğal gaz
93 LEFATEKS KİMYA İstanbul BsY 750 450.000 Doğal gaz
94 KARAGÖL ET Erzurum BsY 500 300.000 Doğal gaz
95 KARAGÖL ET Erzurum BsY 1000 600.000 Doğal gaz
96 SARIÖNDER ET Sivas BsY 500 300.000 Doğal gaz
97 ANGORA HALI İstanbul BsY 500 300.000 Doğal gaz
98 ITC ENERJİ Ankara BsY 1250 750.000 Doğal gaz
99 MERVE ÖRME İstanbul BsY 750 450.000 Doğal gaz
100 ÖZTEKİN MAKİNA Azerbeycan BsY 1500 900.000 Doğal gaz
101 ÖRNEK MAKİNA Adapazarı BsY 750 450.000 Motorin
102 NÜMAKSAN Rusya BsY 500 300.000 Doğal gaz
103 TETA MEKANİK Eskişehir BsY 500 300.000 Doğal gaz
104 ÖRNEK MAKİNA İstanbul BsY 750 450.000 Doğal gaz
105 STOK BsY 500 300.000 Doğal gaz
106 ÖRNEK MAKİNA İstanbul BsY 750 450.000 Doğal gaz

Suggestions

Aenean vulputate eleifend tellus. Aenean leo ligula, porttitor eu, consequat vitae, eleifend ac, enim. Aliquam lorem ante, dapibus in, viverra quis, feugiat a, tellus. Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus. Donec quam felis, ultricidictum felis eu pede mollis pretium. Integer tincidunt. Cras dapibus. Vivamus elementum semper nisi.